Sub-soil Investigation » Major Running Projects

1. Geotechnical Investigation work for proposed Design and Construction of Twin Tunnel by Shield TBM, Underground Station (Ramganj Chaupar), Cut & Cover Tunnel Box and Underground Ramp from Badi Chaupar Dead end Ch.:10387.860 to Underground Ramp end Ch.:13040 of Jaipur Metro Phase -1C Including Entry Exit Structures, Architectural Finishing, Water Supply, Sanitary Installations and drainage Works at Jaipur, Rajasthan, India

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Date of Assign the Contract: 25.09.2023

Completion Date: 24.02.2024

2. Geotechnical Investigation (Pre-Tender) work for proposed Construction of Haryana orbital rail corridor connecting palwal to sonipat bypassing delhi area by linking asaoti-patli-sultanpur-asaudah by new electrified BG double line on EPC Mode.

Authority Under Whom Executed
Kalpataru Projects International Limited
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Date of Assign the Contract: 08.12.2023

Completion Date: 07.02.2024

3. TAM grouting at Chunniganj metro station, Kanpur, U.P.

Authority Under Whom Executed
Gulermak Sam India Kanpur Metro Joint Venture
SN Sen Degree College, Phool Bag Civil Line, Irrigation Land, Mall Road, Kanpur, Kanpur Nagar, Uttar Pradesh, 208001

Date of Assign the Contract: 29.12.2023

Completion Date: 28.03.2024

4. Geotechnical Investigation work for Proposed Multi Modal Logistics Park (MMLP) Indore near Pithampur, in Dhar District in the State of Madhya Pradesh by National Highway Logistics Management Limited.

Authority Under Whom Executed
GR Infraprojects Limited
2nd Floor, Novus Tower, Plot no. 18 Sector 18, Gurugram, Haryana - 122015

Date of Assign the Contract: 06.11.2023

Completion Date: 05.05.2024

5. Vertical load testing of test piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/ Reaction augers, installation of measuring instrument, preparation of pile head, conducting the vertical pile load test and submission of test report but excluding excavation of pit up to the cut-off level of pile and cutting of cut-off length of pile. complete as per specification. Initial load test up to 300 tonnes (Test Load 2.5 times the Safe/ design capacity ie. 120T).

Authority Under Whom Executed
H.G. Infra Engineering Limited
14,PANCHWATI COLONY,RATANADA,JODHPUR 342001,Rajasthan(India)

Date of Assign the Contract: 05.01.2024

Completion Date: 04.02.2024

6. Geotechnical Investigation, Preparation of Geotechnical Report for designing of foundations for HORC Viaduct between Sohana & Dhulawat stations of Orbital Rail Corridor (HORC) Project in the State of Haryana.

Authority Under Whom Executed
Haryana Rail Infrastructure Development Cor. Ltd.
Plot No. 143, 5th Floor, RailTel Tower, Sector-44, Gurugram, Haryana.

Date of Assign the Contract: 11.09.2023

Completion Date: 30.03.2024

7. KNPCC-11 UG: Geotechnical Investigation work Design and construction of TBM Tunnel, Cut & Cover Tunnel, ramp after Double Pulia, ramps in Agriculture Depot and depot connections and three underground stations (viz. Rawatpur, Kakadeo and Double Pulia) including architectural finishes.

Authority Under Whom Executed
Kalpataru Projects International Limited
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Date of Assign the Contract: 30.12.2023

Completion Date: 29.02.2024